Optimist Pool Bath House Renovation
Moisture was a large issue in these locker rooms, creating the need to completely remove and replace the plumbing chase walls. The new wall construction took moisture into consideration by using CMU blocks as the base of the metal stud wall and using moisture resistant materials...