Skip to content

Greenville Outdoor Aquatic Facility

The new 4,000 sf bathhouse includes tickets/first aid/office, locker rooms, storage and filtration for a 160,000 gallon pool with play structure, water slide and 6 lap lanes. The new outdoor aquatic facility is located adjacent to an existing recreation center and park. The bathhouse marks the entrance to the facility and defines the north edge of the site. Exterior materials and finishes complement Greenville Recreation & Parks color standards and the adjacent Eppes Center.

Yates Mill Cabin

We are the lead designer for repairs and a new flood-proof foundation for the cabin located near the mill. Our design incorporates salvaged logs, wood, and stone to maintain the character of the cabin. The Cabin Repair builds on our previous experience as a subconsultant. In 2017, we teamed with the Landscape Architect to develop masterplan concepts and to assist the Owner with budgeting and scheduling future projects. Our work included study concepts for an accessible path to the mill, relocation and restoration of the Phares Yates house, new amphitheater, wagon shelter, and maintenance building.

Pullen Aquatic Center

Improvements to the 40,000 sf existing building include roof and skylight replacement; exterior envelope and structural repair; pool deck repair; door and hardware replacement; lighting replacement; and new HVAC for the natatorium.
Osterlund Architects Logo

Osterlund Architects is a full-service architecture and interior design firm, committed to our clients and their work from concept through construction, and through to their next opportunity. Our firm has expertise in all project phases, including programming, pre-design and planning through construction administration and closeout, as well as interior design, including furniture, fixtures and equipment (FFE) services.

Back To Top