optimist pool bath house renovation
raleigh, NC – Civic Project
Status Completed 2025
Owner City of Raleigh Parks, Recreation, and Cultural Resources
Project Description
Moisture was a large issue in these locker rooms, creating the need to completely remove and replace the plumbing chase walls. The new wall construction took moisture into consideration by using CMU blocks as the base of the metal stud wall and using moisture resistant materials throughout. Plumbing fixtures and bathroom accessories were all removed and reinstalled, and both locker rooms received updates interior finishes including fresh new water inspired tile designs, epoxy flooring, and paint.
Team
Principal Kristen Osterlund
Project Manager Ashley Sessoms
Interior Designer Ashley Sessoms, Sara Chambers
Structural Engineer Lynch Mykins
PME Engineer Sigma Engineered Solutions