Skip to content

WTCC- Buildings “SK” and “SL” Mechanical System Replacement

Wake Technical Community College- Buildings “SK” and “sl”

Raleigh, NC

Status Construction Administration
Owner Wake County Facilities Design & Construction
Total Construction Cost $2,589,000
(Includes $204,966 for Architectural) 

Project Description

The Building SL Student Services Center was occupied during the removal of existing soffits and installation of new mechanical equipment. During demolition, evidence of water intrusion from exterior walkways and deteriorated structural conditions were found. The Design Team prepared a Study to assist WTCC in planning a separate structural repair project. At Building SK, we designed a new office, boiler room, roof access ladder, and replacement interior finishes. We also permitted the Temporary Bookstore space in Building ST.

Osterlund Architects is a Consultant to SIGMA Engineered Solutions for this project, and Lynch Mykins is a subconsultant to Osterlund Architects.

Team

Project Lead Sigma Engineered Solutions
Architect
Kristen Osterlund
Interior Designer Ashley Sessoms
Structural Lynch-Mykins

Osterlund Architects Logo

Osterlund Architects is a full-service architecture and interior design firm, committed to our clients and their work from concept through construction, and through to their next opportunity. Our firm has expertise in all project phases, including programming, pre-design and planning through construction administration and closeout, as well as interior design, including furniture, fixtures and equipment (FFE) services.

Back To Top